Industrial complex for fitting, welding and painting
for Arctic LNG 2 modules
Design work period
2020
Role on the project
Steel design team leader
Lead structural engineer
Duties
Steel design team management
Design management
Design schedulling
Main calculations
Structural optimization coordination
3D-modelling coordination
BIM-coordination
Architectural, general plan, technological and structrural concept design with colleagues and client
Drawing documentation check
Fabricators' models check
Interaction with subcontractors (gates, cranes, equipment designers and vendors)
Experience
Less than a year between the very beginning of conceptual design to finished buildings on construction site
40 meters trusses span
40 meters high
50t cranes
Large entrance gates
BIM work experience
Optimization of Tekla Structures environment to meet client's requirements
Supplementation of phasing function to Tekla Structures to sinchronize multi-phase models with Revit
Development of a new application to automate and speed up process of drawings release
Full task management between design departments via models
3D-model recovery of existing structures from archived drawings, scanned point clouds, surveys, photos